#65 closed task (fixed)
Document GUI Engine Needs
Reported by: | Stuart Walpole | Owned by: | Stuart Walpole |
---|---|---|---|
Priority: | Should Have | Milestone: | |
Component: | Core engine | Keywords: | |
Cc: | Patch: |
Description
- Document the needs of the revised GUI engine. Essentially do a postmortem on the current system and see where it can be improved (an initial start on that in the sections below). With any luck this'll provide a game plan to Gustav to make amends in the time before he goes to Japan, and then for his successor to take over.
- (Merge the GUI Engine Trac task into that brief, and post for feedback.)
- 01/05/06 "3 weeks to compile a wishlist for Gee, then he has 3 weeks of spare time."
- "the school is coming to an end in 3 weeks so I have to pretty much study every day until then. Although when it's over I have 3 weeks completely free before I leave for Japan."
Note:
See TracTickets
for help on using tickets.
Created GUI task tickets with aid of programmers (thanks, guys), ready for Gustav's intervention.
Closing task.