Opened 7 years ago
Closed 7 years ago
#4527 closed defect (duplicate)
Pyrogenesis needs too long for shutdown
Reported by: | Imarok | Owned by: | |
---|---|---|---|
Priority: | Must Have | Milestone: | |
Component: | Core engine | Keywords: | |
Cc: | Patch: |
Description
Sometimes pyrogenesis takes very long to shutdown.
This is because the Deinitialization of the UserReporter called from here needs between some us and multiple minutes.
There is also a TODO there in L185: TODO: should have a timeout in case of network hangs
.
Change History (5)
comment:1 by , 7 years ago
Summary: | Pyrogenesis needs long to shutdown → Pyrogenesis needs too long for shutdown |
---|
comment:2 by , 7 years ago
Milestone: | Alpha 22 → Backlog |
---|
comment:5 by , 7 years ago
Milestone: | Backlog |
---|---|
Resolution: | → duplicate |
Status: | new → closed |
see above
Note:
See TracTickets
for help on using tickets.
(so apparently it was hanging because of Philips server hanging often)